Light Industrial Unit Project

Combined ShapeCreated with Sketch.

Light Industrial Unit Project

This thriving business ran out of space at their existing facitility. The business utilised local staff so it made sense to build a new unit on the same Industrial Estate rather than relocate. As this was a Landlord-led project we future-proofed the building so that it could be sub-divided at a later date if necessary. To facilitate this we provided separate ducting for services and individual drainage to each demise. The build style and colour scheme was chosen to blend in with the existing site. In 18 weeks we handed over the keys to the tenant. Their business continues to flourish and they’re making savings in energy with a modern, well insulated building.