35 years of production and storage had taken its toll on this particular building. Our brief was to ready it for a new, incoming tenant. As always, cost is paramount. We initially concentrated on securing the fabric of the building. New roof lights and coatings ensured that the building would have another 30 years of life with minimal further maintenance. Following repairs to walls and liner panels we re-decorated the workshop entirely; steels, purlins, liner panels as well as floors were prepared and coated. The heaters, de-stratification fans were serviced or replaced, as necessary. The Offices, WC block and Kitchenette were replaced with new ceiling, decorations and floor coverings provided too. The transformation was staggering. Once handed over the unit was swiftly let.