Office Refurbishment Project

Combined ShapeCreated with Sketch.

Office Refurbishment Project

An outgoing tenant had looked after the building but over the course of their tenure many alterations had been made; installing air conditioning to a few rooms, adding data points, amending small power and so on. In these instances letting the building again can be problematic as it very often does not suit a new tenant’s thoughts or business operations. 

In this instance we stripped the building back to it’s fabric, removed all the amended data and electrical items and restored it to an open-plan office block. We refurbished the Kitchen which was in good order but suffering from de-lamination of the door foils; to reduce costs we took the doors to a specialist sub-contractor that prepared them and re-sprayed them with a 2 pack (hard wearing) paint to the client’s colour choice. We provided fresh certification for the lift and for the Electrical installation, we installed a new climate control system too. Some careful, client-led, paint colours along with refurbished doors and new floor covering completed the project. All done and the keys handed back in 8 weeks.